From planning to a permit you can build on

Every project runs the same road: work out what the lot allows, design it, engineer it, submit it, and answer the city until the permit is issued. Here is the whole route, step by step, so you know what happens next and roughly when.

PlanWeeks 1–2
DesignWeeks 2–4
EngineerWeeks 4–6
SubmitWeek 6
PermitWeeks 8–16

About the timing. The weeks below are typical for a straightforward Los Angeles ADU or garage conversion. State law gives the city 15 business days to tell us the application is complete and 60 days to act on an ADU, but clearances, corrections and your own decisions move the finish line. Hillside, coastal, historic and multi-unit projects take longer. We give you a schedule for your project at the consultation, not a generic one.

The route

Ten stages, start to permit

A

Consultation

Week 1

We sit down with your address, your zoning and your goals. We pull the lot from the city's records, look at what is already built on it, and talk through what you actually want: rent, family, resale or development.

  • Every program your lot qualifies for, compared
  • A straight answer on what fits and what does not
  • A written scope and fee so there are no surprises later
B

Site visit and as-built survey

Week 1–2

We measure the property: the house, the garage, the setbacks, the grade, the panel, the sewer. Everything after this is drawn on top of these numbers, so we take them ourselves rather than trusting old drawings.

  • Measured as-built drawings of what exists today
  • Photos of the conditions that matter to plan check
  • Turnaround in as fast as 48 hours
C

Zoning and feasibility study

Week 2

The part that decides how much you get. We run lot area, zone, allowable floor area, setbacks, height, parking, open space and which ADU or SB 9 bonus applies, then compare the routes side by side.

  • Allowable floor area and the bonus that beats it
  • Maximum unit count and size for your lot
  • One clear recommendation, with the runner-up explained
D

Schematic design

Week 2–4

Layouts, in plain drawings you can read. We work through where the kitchen, bath, entry and windows go, how the new unit reads from the street, and what keeps construction simple and cheap.

  • Floor plans and elevations to react to
  • As many rounds as it takes to get it right
  • Square footage locked before anything is engineered
E

Construction documents

Week 4–6

The full set the city reviews and your contractor builds from: site plan, demolition plan, floor plans, roof plan, elevations, sections, electrical layout, door and window schedules, and the code and green-code notes.

  • A complete drawing set at permit standard
  • Every dimension a bidder needs to price the job
  • Title sheet with the zoning math shown on its face
F

Structural engineering and Title 24

Week 4–6

Foundation and framing are engineered and stamped by a California-licensed civil engineer. Energy compliance is run and signed by a certified energy analyst.

  • Foundation plan, framing plans and details
  • Shear wall and holdown schedules
  • Title 24 energy forms, signed and registered
G

Permit application and submittal

Week 6

We prepare the application, assemble the set and submit it to LADBS or your city. You do not stand in line and you do not get sent home for a missing form.

  • Application filed under your ownership
  • Set uploaded or walked in, whichever the city wants
  • Plan check number you can track
H

Plan check corrections

Week 8–14

The city comes back with comments. We answer them, redraw what needs redrawing, coordinate the engineer and resubmit, as many rounds as it takes. This is the stage that stalls most projects, and it is the stage we do for a living.

  • Every correction answered in writing
  • Revised sheets issued and resubmitted
  • You hear from us at each round, not at the end
I

Clearances and fees

Week 10–16

Most projects need more than one counter: planning, fire, public works or sewer, school fees, and sometimes grading or a methane form. We chase the clearances and tell you exactly what each city fee is before it is due.

  • Clearances cleared one by one
  • A written list of city fees, with who pays what
  • No surprise invoices at the counter
Z

Permit issued

Ready to build

The permit is issued and the approved set is stamped. You are holding everything a contractor needs to start, and everything three contractors need to bid against each other.

  • Stamped, approved plans in your hands
  • A set you can send out for competitive bids
  • Deferred submittals and revisions handled during construction
After the permit

What we still do once construction starts

We stop at the permit on purpose. We are a design and permitting firm, not a builder, so nothing in your drawings is steering you toward one contractor.

BiddingAn approved set is the only honest way to compare contractors. Same drawings, same scope, three real numbers. We are not a builder and we do not take a cut of the build, so the bids come back to you clean.
RevisionsThings change on site. If the city needs a revision during construction, we draw it and run it through.
Deferred submittalsTrusses, solar, and anything else the city defers get submitted and cleared as they come up.
InspectionsWe answer the questions inspectors ask about the drawings, so your contractor is not guessing.