Starting January 1, 2027, California cities must approve two new detached ADUs behind a single-family home instead of one. Here's what that means for your lot, in plain English and pictures.
What changes
California's ADU law lists the units every city must approve "ministerially", meaning by objective rules, with no hearing and no neighbor appeal (Gov. Code § 66323). Until now that list included one new detached ADU on a single-family lot. AB 956 (Quirk-Silva, Chapter 791, Statutes of 2026) raises it to two.
It applies to lots with an existing or proposed single-family home, and to newly built ADUs. Converted ADUs (like a garage conversion) still have their own separate guarantee.
What it looks like on a typical lot
These simple diagrams show the combinations the state guarantees on a single-family lot. The total number of homes stays about the same; what's new is the choice of layout.
Which option is better? Option B suits deep lots where two small cottages give each tenant more privacy than a unit carved out of the main house. Option A keeps everything closer together and uses space you already have. We'll test both on your survey.
How big and how tall
- Size: up to 800 sf each is guaranteed. Los Angeles's own ADU rules can allow more.
- Setbacks: no more than 4 ft from the side and rear lot lines.
- Height: at least 16 ft; 18 ft within half a mile of major transit, plus up to 2 ft to match the main house's roof pitch (Gov. Code § 66321).
- Existing problems: the city can't make you fix existing nonconforming conditions on the lot as a condition of approving the ADUs.
Lower fees for bigger ADUs (SB 1117)
Signed the same day, SB 1117 (Cervantes, Chapter 809) changes how impact fees are counted. ADUs of 750 sf or less still pay no impact fees. For up to two ADUs on a lot, a larger ADU now pays only on the square footage above 750 sf (Gov. Code § 66311.5).
Only the space above 750 sf counts, for up to two ADUs on a lot. 1,000 sf − 750 sf = 250 sf, so the fee is 250 ÷ 2,000 × $20,000 = $2,500. Example from the law firm Best Best & Krieger.
Utility connection fees and plan check fees are separate and still apply.
What stays the same
No owner-occupancy rule
You don't have to live on the property to rent the ADUs.
Long-term rentals
Rental terms must be longer than 30 days.
No new sprinkler rule
Sprinklers aren't required in the ADU if the main house doesn't need them.
Not sold separately
ADUs stay part of the property unless your city opts in to AB 1033 condo sales.
HOAs can't block it
AB 956 extends HOA protections to every zone that allows a single-family home.
Site still matters
Utilities, access, trees, slope and fire zones decide what actually fits.
What to do now
- Check your lot. Lot depth, existing garage, utilities and access decide whether Option A or B fits.
- Design now, file in January. Plans take time. If you start in December, your set can be ready to submit on January 1, 2027.
- Keep an ADU at 750 sf or less if you can. That avoids impact fees entirely; from 2027 a larger unit pays only on the extra area.
- Plan the whole lot at once. Even if you build one ADU now, we can place it so a second one fits later.
Frequently asked questions
When does AB 956 take effect?
January 1, 2027. It was signed on September 29, 2026. Applications filed before then are reviewed under the current one-detached-ADU rule.
How big can each of the two detached ADUs be?
The state guarantees up to 800 sf each, with 4-ft side and rear setbacks and at least 16 ft of height (18 ft near transit). Los Angeles can allow larger units under its own ADU ordinance.
Can I still have a JADU?
If you build two new detached ADUs, the city no longer has to approve a JADU too. If you build one detached ADU, the converted ADU and the JADU, everything works as it does today.
Does this work on a vacant lot?
Yes. It applies to lots with an existing or a proposed single-family home, so the ADUs can be planned together with a new house.
Can I sell the ADUs separately?
Generally no. ADUs stay part of the property, except where a city has opted in to condo sales under AB 1033.
Do I have to live on the property?
No. Owner occupancy isn't required for ADUs. Only a JADU that shares a bathroom with the house requires the owner to live there.
Is this the same as SB 9?
No. AB 956 is an ADU law: the extra homes are ADUs with ADU fee breaks and no owner-occupancy rule. SB 9 creates additional primary homes and has its own eligibility rules.
Official sources
- AB 956 bill text and history
- SB 1117 bill text and history
- Gov. Code § 66323 (units every lot gets) · Gov. Code § 66311.5 (fees) · Gov. Code § 66321 (size and height)
- HCD ADU Handbook
Related: every ADU law change, year by year · ADU guide · SB 9 guide
This guide is general information, not legal advice, and laws change often. Code sections link to the official California Legislative Information site. Confirm current rules for your property before you build.
Want to know what fits on your lot?